Our Experience. Demonstrated in the Field.

Since 2010, Danny Turner has led DRT’s offshore decommissioning in the Gulf of America. The programs below are that work: well abandonment, platform removal, pipeline decommissioning, and multi-asset programs.

The record from before DRT is at the end. Government agency names are kept as they were at the time of the work.

“MMA (BSEE) Orphan Well Project” | SVP of DecommissioningMarine Minerals AdministrationBureau of Safety and Environmental EnforcementPromethean Energy

Well Abandonment and Decommissioning

Makesafe, pipelines, structures, wells, compliance, engineering, planning, HSERQ.

Built the MMA (BSEE) project management system from the ground up. SCM, finance, projects, engineering.

Onboarded the subcontractor portfolio and the project team.

Offshore Projects:

  • MI-632 #7, #8, #9 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
  • MI-656 #2, #3, #4 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
  • MI-657 D1, D2, D3 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
  • ST-21 #82 — damaged leaning structure abandonment and removal. Well control issue, T&A and DB P&A. Complete.
  • HIA589 H1 and H2 — inspection, makesafe, self-lift crane, camp, wellhead maintenance, flushing, diagnostics, T&A. Complete.
  • WD117H H1, H2, H3, H4 — hurricane-damaged structure makesafe, self-lift crane, camp, wellhead maintenance, flushing, diagnostics, T&A. Complete.
  • GI22 P30, P34, R21, R22, R24 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
  • GI23 T49 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Partial.
  • ST-21 #81 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
  • ST27 D9, D10, D13 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
    • D9 and D10 CTU cleanouts.
  • ST54 G11, G14, G20, G24, G25 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Partial.
  • ST67 B27, B43 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Partial.
    • B43 re-P&A — top plug CTU drill-out and B annulus isolation.
  • WD27 B1, B2, B3, B4, B5, B6 — inspection, makesafe, wellhead maintenance, flushing, diagnostics and TA. Complete.
  • WD28 #16, #10, #18, #19 — inspection, makesafe, wellhead maintenance, flushing, diagnostics and TA. Complete.
  • WD29 C6, H5, J1, J4, #37 — inspection, makesafe, wellhead maintenance, diagnostics and TA. Complete.
  • Eni EI-39 A and #2, five wells — inspection, makesafe, wellhead maintenance, flushing, diagnostics and PA. Pipelines 12507 and 12515 abandoned. Structure removal and site clearance, A and #2. Partial.
    • #2 wireline fishing and zonal isolations. Complete.
    • A-1 re-P&A, top plug drill-out and B annulus isolation. Complete.
    • A-2 and A-3 high-pressure zonal isolations. Complete.

“Boomerang Project” | Project and Operations DirectorPetrofacBP

Well Abandonment and Decommissioning

Makesafe, pipelines, structures, wells, compliance, engineering, planning, HSERQ.

Built the project management system from the ground up. SCM, finance, projects, engineering.

Offshore Projects:

  • SP60 A — P&A 24 wells, cut and remove conductors. 6 CTU wells.
  • SP60 D — P&A 24 wells, cut and remove conductors. 5 CTU wells.
  • EB165 A — zonal isolation, 24 wells, cut and remove conductors. 6 CTU wells.
  • SP60 G — P&A 35 wells. 6 CTU wells. Partial.
  • SP60 C/F — P&A 24 wells. 6 CTU wells. 2 HWO wells. Partial.
  • SP60 E/B — makesafe, wellhead maintenance, crane repair and reman.

“BSP HWO Project” | Project ManagerHalliburtonShell

Well Abandonment and Decommissioning

BSP HWO project start-up — planned, engineered, fabricated, and mobilized people and equipment from 13 countries. Nine months from contract to mobilization-ready.

Offshore Projects:

  • Magpie DP02 abandonments — MG22, 23, 31, 32, 24, 21. Complete.
    • Phase I and Phase II.
  • CW-31 smart-well recomplete — planning and partial operation.
  • CW-52 smart-well recomplete — planning.
  • CP-388 acidizing and ESP change-out — planning.

“Lena P&A Project” | Well Abandonment AdvisorWeatherfordExxonMobil

Well Abandonment and Decommissioning

Offshore Projects:

  • ExxonMobil Lena, 52-well plug and abandonment. Weatherford well abandonment advisor.

Project Manager |W&T Offshore

Well Abandonment and Decommissioning

Offshore Projects:

  • MO-867 BB-1 well abandonment, CTU, and caisson removal.
  • WC-197 A-3 well abandonment.
  • VR-201 B well abandonment and structure removal.
  • WC-173 C-3, C-8, C-9 and C-10 well abandonments.
  • WC-198 A1, A3, A4 and A5 well abandonments.
  • VR-201 B-1 well abandonment.
  • WC-295 #3 well abandonment, CTU, and pipeline abandonment.
  • WC-173 C-5 well abandonment, CTU.
  • WC-173 FA-1, FA-2 and FA-3 well abandonments.
  • WC-173 C1 and C8 well abandonments.
  • WC-181 C-2 well abandonment, CTU.
  • WC-198 C1 well abandonment, CTU, and flush of two pipeline segments.
  • WC-197 A-1 well abandonment, CTU.
  • WC-181 FVA/CA, two 4-pile removals and 5 well abandonments.
  • WC-197 A-2 well abandonment.
  • WC-172 CC, 3 well abandonments.
  • 12-location side-scan site clearance.
  • SS-239 A platform removal, 8-pile.
  • SS-239 B platform removal, 4-pile.
  • WC-198 C-3 well abandonment.
  • WC-180 G, 3 well abandonments.
  • 10 pipeline decommissionings, WC and EI.
  • WC-180 E, 10 well abandonments.
  • WC-180 A, 6 well abandonments.
  • VR-320 4-pile platform removal. Partial.
  • EI-205 field decommissioning — 11 platforms, 12 pipelines, 39 well abandonments. Partial.
  • SS-232 B-2 and B-12 well abandonments. Partial.
  • SS-291 B-6 well abandonment. Partial.
  • EI-95 #5 well abandonment.
  • SS-214 #4 well abandonment.
  • WC-554, 5 well abandonments and 4-pile structure removal.
  • SS-239 A and B, 11 well abandonments.
  • SS-33 #7 well abandonment and platform removal.
  • HI-177 A, 8 well abandonments and 4-pile platform removal.
  • HIA-389, 8 well abandonments. Partial.
  • GA-303 A, 2 well abandonments.
  • GA-303 #5, #7 and B well abandonments and caisson removal.
  • 19 pipeline decommissionings, MP, EI, and SS.
  • EI-371 A downed-platform team.
  • EI-379 A downed-platform team.
  • EI-349 A downed-platform team.
  • HIA-371, 2 bubbling wells.
  • HIA-369, 1 bubbling well.
  • EI-349 A, 21 bubbling wells.
  • GB-21 #1 subsea well P&A.
  • GB-22 #1 subsea well P&A.
  • GB-139 #1 subsea well P&A.
  • GB-139 #2 subsea well P&A.
  • EC-373 #4 subsea well P&A.
  • 3 pipeline decommissionings, SS-30.
  • VR-23 C-1 and C-2 well abandonments and caisson removal.
  • VR-23 #2 well abandonment and caisson removal.
  • MP-108 C-1 well abandonment and caisson removal.
  • MP-102 C, C-5, C-6, C-7 and C-8 well abandonments. 4-pile platform removal.
  • MP-102 A-3, A-4 and A-5 well abandonments.
  • MP-93 A-1, A-2 and A-3 well abandonments.
  • MP-70 #1 well abandonment, pipeline decommissioning, and caisson removal.
  • MP-69 #4 well abandonment and caisson removal.
  • HIA-371 A 4-pile platform removal.
  • EI-349 B, 18 well abandonments and 8-pile platform removal.
  • EC-373 A-1, A-2 and A-3 well abandonments.
  • HI-384 A-1, A-2, A-3, A-4 and A-5 well abandonments.
  • EC-369 A-1 and A-2 well abandonments.

Well Site Manager |W&T OffshoreTalosShell

Well Abandonment and Decommissioning

Offshore Projects:

  • MP-69E and WC-149, 8 site clearances. W&T.
  • Deck foreman, Colibri / Poinsettia — two 24-inch J-tube subsea drifts. Trinidad. Subsea7 / Shell.
  • WC-215 A-1, A-2, A-3, A-7, A-8, A-13 and A-14 well P&A, annular issues. Talos.
  • MP-69D DSV site clearance. W&T.
  • WC-180 E DSV site clearance. W&T.
  • GB-72A pipeline abandonment. Riser and umbilical removal.
  • Production I&E, piping, flowline and skid removals. W&T.
  • VR-226A damaged-structure site clearance. W&T.
  • MP-109 C and D braced caisson removals. W&T.
  • EI-90G caisson removal. W&T.
  • EI-90 #12 and EI-88 A site clearance. W&T.
  • MP-108 D-1 P&A re-entry, snubbing, remedial cementing, sustained casing pressure, bubble mitigation, conductor removal. W&T.
  • WC-180 field, 30-well testing campaign.
  • HI-119 A-1 CTU re-entry, mill-out and fishing, remedial cementing, SCP and bubble mitigation. P&A of A-1, A-2 and A-3. W&T.
  • VR-279 A-1 slickline fishing, zone isolation, SCP mitigation. W&T.
  • VR-226 A-9 CTU re-entry, mill-out and fishing, tubing recovery, casing milling and removal, SCP bubble mitigation. Partial. W&T.
  • HI-110 A-7 CTU re-entry, mill-out and fishing, tubing recovery, casing milling and removal, SCP bubble mitigation. Partial. W&T.

Prior record, before DRT

Offshore Project Engineer | Norse Cutting & Abandonment

Offshore Projects:

  • WC-630, 24 well abandonments. Partial. Meritech.
  • WD-593, 10 well abandonments. Partial. Mariner.
  • ST-171D, 19 well abandonments. Stone.
  • SS-209A, 8 well abandonments and platform removal. Hilcorp.
  • WD-105, 4 well abandonments. Apache.
  • ST-164C, 6 well abandonments. Stone.
  • EI-372, 13 well abandonments. El Paso.
  • SM-66, 9 well abandonments. Apache.
  • SM-128, 3 well abandonments. Apache.
  • Devon, 1 tripod platform removal.
  • Manson Gulf, 1 tripod platform removal.
  • Chevron, 50+ well abandonments. Partial.
  • SM-11, 3 well abandonments. Mariner.
  • SM-136B, 10 well abandonments. Mariner.
  • MB-95E, 2 well abandonments. Shell.
  • SM-149A, 25 well abandonments. Mariner.
  • SM-149B, 15 well abandonments. Mariner.
  • 3 well abandonments. Partial. Anglo-Suisse.

Fabrication Manager | IDM Equipment

  • 12 builds of 2,000 hp Quicksilver rigs. No-crane rig move. 24-hour rig-up. XY skidable.
  • 2 box-on-box subzero 3,000 hp rig builds.

Special Projects Manager |Hughes Christensen

  • Visual single-point cutter rebuild.
  • Downhole drilling simulator, digital controls and data-acquisition conversion.
  • Downhole motor impact simulator.
  • High-pressure abrasive wear tester.
  • Automated tricone cut-wheel photographer.
  • Other upgrades on lab equipment, controls, and data acquisition.